Eastern Busway Update: public consultation is now open for Stage 4 from Tī Rākau Drive to Botany Town Centre!
As a reminder:
Stage 1 Panmure to Pakuranga: completed
Stage 2 Pakuranga & Flyover: initial pre-construction has started, final resource consenting process underway
Stage 3R Pakuranga to Tī Rākau bridge (near Riverhills): final resource consenting underway
Stage 3C Tī Rākau bridge through Burswood: pending resource consent
Stage 4 Burswood to Botany: public consultation open
Stage 4 is being split into two parts:
EB4i: an interim route that will be in place by 2027 and will be in use until the link route is funded and built.
EB4L: Link the preferred, proposed design that will go for consents in August 2023 and built when funding is approved.
The Eastern Busway Team are hosting two public drop in sessions where you can find our more information and ask questions.
Wednesday 23 August 2023, 3pm – 7pm
Saturday 26 August 2023, 10am – 1pm
St Columba Presbyterian Church, 480 Tī Rākau Drive, Botany
You can find out more online, including how to provide your feedback.